
Add to Cart
Ss304 201 New Style Color Standbast Stainless Steel Sheet Decoration Home ,Wall
Application
Stainless steel partition screen is mainly used in hotels, restaurants, clubs, villas, clubs, KTV, home furnishing, squares, supermarkets and so on
Use: it can not only decorate the house but also play a blocking effect.
Classification
Stainless steel and patterned plates are also called stainless steel chaotic patterned plates. They are formed by irregularly swinging the grinding head up and down through professional equipment. Stainless steel and pattern plates have a unique visual effect. The long-sighted view is a circle of swirling patterns, and the near-sightedness is a chaotic pattern.
Due to the special texture on the surface of stainless steel and patterned plates, they have stronger abrasion resistance, scratch resistance and fingerprint resistance than ordinary stainless steel plates. Compared with common plates such as frosted plates and brushed plates, stainless steel and corrugated plates are obviously more high-end and outstanding. Therefore, when stainless steel and pattern boards were introduced to China from Europe, they were favored by various industries and were widely used in decorative engineering, furniture, machinery equipment decoration, cabinet panels and other fields.
Grade | STS 304 | STS 316 | STS 430 | STS 201 |
---|---|---|---|---|
Elong(10%) | Above 40 | 30MIN | Above 22 | 50-60 |
Hardness | ≤200HV | ≤200HV | Below 200 | HRB100,HV230 |
Cr(%) | 18-20 | 16-18 | 16-18 | 16-18 |
Ni(%) | 8-10 | 10-14 | ≤0.60% | 0.5-1.5 |
C(%) | ≤0.08 | ≤0.07 | ≤0.12% | ≤0.15 |
FAQ
1. WHO IS MEIBAOTAI ?
Meibaotai Stainless Steel Products Co., Ltd.,which is the largest stainless steel products manufacturing and storing base for South China.
2. WHAT TYPES OF PAYMENT DO YOU ACCEPT?
The types of payment we usually use L/C and T/T.
3. HOW ABOUT THE CAPACITY OF YOUR COMPANY?
Our production capacity is 7000-8000tons / month.
4. WHAT IS YOUR TERMS OF DELIVERY?
EXW, FOB, CFR, CIF.
Generally, it will take 25 to 30 days after you confirm the elevator (escalator) specification and drawing, and receiving your advance payment.